01028 GKP DR SPL Journey Details
GKP DR SPL (01028) leaves from MAU JN (GKP) at 17:00 on 1st day of departure, and halts at 23 Stations, before arriving at its final destination, DADAR (DR) at 03:30 on day 0. It takes 34hr 5 min to reach from MAU JN to DADAR covering a distance of 1877 km. The train halts at Block Catch Siding Cabin 3 (TGR3), Mahawan Khor Halt (MVKR), Gorakhpur East Lobby (GKPE), Block Catch Siding Cabin 2 (TGR2), Gorakhpur Junction (GKP), Gorakhpur Cantt (GKC)

